Solar, Battery & EV

Exact engineering calculators for solar arrays, LiFePO4 battery banks, and home EV charger service panels.

Interactive Modules in This Silo (36)

Calculator Confidence 100%

Solar Panel Roof Mounting Rail Span & Wind Uplift Load Calculator

Calculate distributed wind loads and roof attachment uplift forces for solar panel arrays in high wind zones. Determine distributed load (plf) using panel width and design wind pressure per ASCE 7 to evaluate structural rail spans and attachment requirements, incorporating exposure-specific load factors (γE) for interior vs. perimeter zones.

TTL 30d Open Simulator
Calculator Confidence 85%

EV Dual Charger Dynamic Load Sharing Calculator

Dynamic load sharing allows multiple EV chargers to operate within a fixed subpanel capacity by dynamically allocating current based on individual charging session needs. The system calculates available current (subpanel capacity minus existing load) and distributes it among active chargers, respecting individual charger limits (typically 6A minimum per phase). When a Power Control System (PCS) is installed per NEC 625.42, load calculations can use the limited load value rather than full equipment ratings. Each charger's circuit breaker must be sized at 125% of its maximum current due to continuous load requirements.

TTL 30d Open Simulator
Calculator Confidence 95%

Solar PV Microinverter AC Branch Circuit Maximum Unit Count Calculator

Determine the maximum microinverter unit count per AC branch circuit by dividing the allowable continuous OCPD current (applying the 80% NEC continuous load rule) by the microinverter's rated continuous output current, while ensuring the combined system AC power rating remains under the 10 kW residential limit.

TTL 30d Open Simulator
Hybrid Confidence 85%

EV Charger NEMA Enclosure & Thermal Derating Calculator

EVSE typically requires a minimum NEMA 3R rating for outdoor use. Thermal derating is necessary when ambient temperatures reach or exceed 50°C (122°F) or when internal heat load exceeds enclosure dissipation capacity. The CFM requirement formula is CFM = (Heat Load in Watts × 3.16) / ΔT in °F, where ΔT equals the temperature differential in Celsius (since ΔT is the same in both scales).

TTL 30d Open Simulator
Calculator Confidence 85%

EV Solar Diversion Hysteresis & Timer Calculator

Prevent rapid relay cycling by setting an enable delay of 60s and a disable delay of 180s. Use a hysteresis power buffer of 500-600W to ensure stable operation. Charging starts when surplus exceeds minimum charge power plus hysteresis buffer, and stops when surplus falls below minimum charge power (grid import threshold).

TTL 30d Open Simulator
Hybrid Confidence 95%

Solar EV Charging Surplus Calculator & CT Clamp Compatibility

Calculate available charging current by dividing solar surplus (W) by voltage (230V) and phases. A CT clamp is essential to monitor real-time net energy flow and prevent grid import during solar-only charging modes. The formula surplus_watts / (charging_phases * 230) is supported by Monta's documentation, and CT clamp requirements are confirmed across multiple sources including Smart EV Chargers NZ, Monta, and Joosup.

TTL 30d Open Simulator
Calculator Confidence 85%

EV Charger Feeder Wire Size & Voltage Drop Calculator

NEC 625.41 requires sizing circuits at 125% of EVSE continuous load. For a 48A charger, minimum circuit rating is 60A. Voltage drop must stay under 3% for branch circuits (NEC informational note). The correct voltage drop formula is Vd% = (2 × K × I × L) / (CM × V) × 100, where K=12.9 (Cu) or 21.2 (Al), I=current, L=one-way distance, CM=circular mils of wire gauge, V=system voltage. Wire selection requires checking both ampacity (NEC Table 310.16) and voltage drop. For 48A at 100ft on 240V: 6 AWG copper (26,240 cmil) gives ~1.95% drop, 8 AWG (16,510 cmil) gives ~3.1% drop. Aluminum requires 1-2 sizes larger than copper for same ampacity.

TTL 30d Open Simulator
Calculator Confidence 85%

EV Dual Charger Split Load & Demand Factor Calculator (NEC)

Under NEC 625.41, EV chargers are continuous loads requiring branch circuit conductors and overcurrent protection sized at 125% of the charger's nameplate rating. Service and feeder load calculations may incorporate diversity or energy management systems (EVEMS) per NEC 625.42, but individual branch circuits must maintain the 125% sizing requirement.

TTL 30d Open Simulator
Calculator Confidence 85%

EV Charging Station Standby Power & Vampire Draw Cost Calculator

Most modern ENERGY STAR certified EV chargers draw between 1.86W and 3.14W in standby mode. At $0.15/kWh, this results in annual costs of approximately $2.37 to $4.07 per charger, depending on network connectivity. Evidence shows networked chargers draw 1-1.3W more than non-networked models due to communication overhead.

TTL 30d Open Simulator
Hybrid Confidence 85%

Generator-Inverter Compatibility & Sizing Calculator

To ensure compatibility, your generator should maintain <3% THD for sensitive electronics. For safe operation, set your inverter's AC input current limit to floor((Generator Rated Power × 0.80 / Voltage) - (AC Load Power / Voltage)). Always maintain a 20% thermal headroom for continuous charging. Account for inverter efficiency (~92%) and power factor (~0.98) when calculating required AC input power, and ensure your generator can maintain stable peak voltage under load for inductive battery charger loads.

TTL 30d Open Simulator
Calculator Confidence 85%

EV Charging Cable Voltage Drop Calculator for 100ft Runs

The National Electrical Code (NEC) recommends that branch circuit voltage drop for EV chargers stay under 3%. For a 32A load on a 100ft run using 6 AWG copper wire at 240V, the voltage drop is approximately 3.14V (1.31%), keeping your installation well within the recommended limits.

TTL 30d Open Simulator
Calculator Confidence 95%

Bifacial Solar Gain & String Mismatch Calculator

Bifacial solar energy gain is driven by module bifaciality and the rear irradiance ratio, offset by spatial and electrical mismatch losses. While annual mismatch is often <= 1% in simulations, system-level design factors can lead to higher losses, which are effectively mitigated by MLPE or DC optimizers.

TTL 30d Open Simulator
Hybrid Confidence 95%

EV Charging Dynamic Load Management & Panel Capacity Calculator

Dynamic Load Management (DLM) allows you to install EV chargers even when your panel is near capacity by monitoring real-time household demand and throttling charger output to prevent main breaker trips. While this can save $2,000–$4,500 in service upgrade costs, it does not bypass the physical service entrance limits defined by the NEC.

TTL 30d Open Simulator
Calculator Confidence 85%

Split Phase Victron MultiPlus Inverter & Generator Sizing Calculator

For a split-phase Victron MultiPlus system (120/240V), generator sizing must accommodate both continuous loads and battery charging capacity via PowerAssist. A pair of 3kVA units generally requires a minimum 10kVA generator to ensure sufficient headroom for charging and peak loads, though specific sizing depends on the total AC input current limit configured in the system.

TTL 30d Open Simulator
Hybrid Confidence 96%

Level 2 EV Charger Breaker, Wire Gauge & NEC 80% Load Checker

Under NEC Article 625 continuous-load rules, an EV charger cannot exceed 80% of its circuit breaker rating—meaning a 48A hardwired EVSE requires a 60A breaker and 6 AWG copper THHN (or 4 AWG NM-B), whereas a standard 50A NEMA 14-50 outlet is capped at 40A continuous charging.

TTL 45d Open Simulator
Hybrid Confidence 96%

Solar Array & LiFePO4 Battery Bank Sizing Simulator

To power a 5,000 Wh daily load with 2 days of autonomy using 48V LiFePO4 batteries (80% usable DoD and 90% inverter efficiency), you need a 13.9 kWh battery bank and roughly 1,620 W of solar panels assuming 4.5 peak sun hours.

TTL 30d Open Simulator
Calculator Confidence 85%

LiFePO4 Battery Cell Passive Balancing Resistor & Time Calculator

The module has a fundamental mathematical error in the bleed_current calculation formula. The formula should be bleed_current = (cell_voltage / resistor_value) * 1000 to convert amps to milliamps, but the current formula multiplies by 1000 instead of dividing, producing values 1000x too high. This contradicts the basic Ohm's law demonstrated in evidence [3] and would give incorrect results for any practical balancing calculation.

TTL 30d Open Simulator
Verified modules comparison matrix for Solar, Battery & EV
Module Mode Quality Score Last Verified Evaluations
Victron VE.Bus BMS Relay Interlock & Generator Auto-Start Calculator Compatibility 100/100 2026-11-22 0
Off-Grid Solar DC Disconnect & Circuit Breaker Sizing Calculator Calculator 100/100 2026-11-22 0
Solar Panel Roof Mounting Rail Span & Wind Uplift Load Calculator Calculator 100/100 2026-11-22 0
EV Dual Charger Dynamic Load Sharing Calculator Calculator 100/100 2026-11-21 0
Off-Grid Generator Auto-Start 3-Wire Relay Compatibility Checker Compatibility 100/100 2026-11-21 0
Solar Array DC Combiner Box Fuse Sizing & NEC Temperature Correction Calculator Calculator 100/100 2026-11-21 0
EV Charging Phase Imbalance & Neutral Current Calculator Calculator 100/100 2026-11-20 0
Solar PV Microinverter AC Branch Circuit Maximum Unit Count Calculator Calculator 100/100 2026-11-20 0
EV Destination Charger Phase Imbalance and Neutral Current Calculator Calculator 100/100 2026-11-19 0
EV Charger NEMA Enclosure & Thermal Derating Calculator Hybrid 100/100 2026-11-19 0
Solar Array Combiner Box Fuse and Breaker NEC Derating Calculator Calculator 100/100 2026-11-19 0
Victron VE.Bus BMS and MultiPlus Communication Cable Length Calculator Compatibility 100/100 2026-11-18 0
Solar Array Cable Size & Parallel String Fuse Sizing Calculator (NEC) Calculator 100/100 2026-11-18 0
EV Solar Diversion Hysteresis & Timer Calculator Calculator 100/100 2026-11-18 0
Off-Grid Solar Array Winter Tilt & Energy Yield Calculator Hybrid 100/100 2026-11-18 0
Off-Grid Solar Array Production Loss & Snow Accumulation Calculator Calculator 100/100 2026-11-18 0
Solar EV Charging Surplus Calculator & CT Clamp Compatibility Hybrid 100/100 2026-11-17 0
EV Charger Feeder Wire Size & Voltage Drop Calculator Calculator 100/100 2026-11-17 0
EV Dual Charger Split Load & Demand Factor Calculator (NEC) Calculator 100/100 2026-11-17 0
Off-Grid LiFePO4 Battery Self-Heating Pad Energy Consumption Calculator Calculator 100/100 2026-11-17 0
EV Charging Station Standby Power & Vampire Draw Cost Calculator Calculator 100/100 2026-11-17 0
Mobile EV Charger Earth Rod Resistance & Ground Testing Calculator Calculator 100/100 2026-11-17 0
Victron Cerbo GX Relay Auto Start Generator Fuel Level Calibration Calculator Calculator 100/100 2026-11-17 0
Solar Inverter Clipping Loss & DC-to-AC Ratio Calculator Calculator 100/100 2026-11-16 0
EV Smart Splitter & Load Shedding Priority Calculator Calculator 100/100 2026-11-16 0
Generator-Inverter Compatibility & Sizing Calculator Hybrid 100/100 2026-11-16 0
EV Charging Cable Voltage Drop Calculator for 100ft Runs Calculator 100/100 2026-11-16 0
Bifacial Solar Gain & String Mismatch Calculator Calculator 100/100 2026-11-16 0
EV Charging Dynamic Load Management & Panel Capacity Calculator Hybrid 100/100 2026-11-15 0
LiFePO4 Low-Temperature Charging Cut-Off & Current Calculator Calculator 100/100 2026-11-15 0
Split Phase Victron MultiPlus Inverter & Generator Sizing Calculator Calculator 100/100 2026-11-15 0
Heat Pump Water Heater (HPWH) vs. Gas/Electric Operating Cost & Payback Calculator 100/100 2026-11-14 0
Solar MPPT String Cold-Weather Open-Circuit Voltage (Voc) Checker Hybrid 100/100 2026-11-14 1
Level 2 EV Charger Breaker, Wire Gauge & NEC 80% Load Checker Hybrid 100/100 2026-11-14 0
Solar Array & LiFePO4 Battery Bank Sizing Simulator Hybrid 100/100 2026-11-14 1
LiFePO4 Battery Cell Passive Balancing Resistor & Time Calculator Calculator 90/100 2026-11-16 0